September cycloproof maintenance inspection list
Time | factory | Production capacity | Maintenance situation |
9月 | Shandong Daze | 5 | September 8 device parking for technical transformation, restart time is unknown |
Shandong huatai | 16 | Sept. 12 pipeline valve damage, the device accidentally reduced to four into negative, about three days | |
dongyinghuatai | 8 | September 6 power plant failure, device short stop 3 days | |
Fujianshihua | 5 | Inspection by the environmental inspection team, the device reduced to negative five percent, about a month | |
shidashenghua | 8 | Device to stop maintenance, the plan to restart at the end | |
fangtaijinghua | 12 | September 19 by the impact of environmental protection checks, the device down to negative Liu Cheng, about a week |